­ ­ Divisions – Soorty

Divisions

SPINNINGAT
A GLANCE

Established in 2011 with a capacity of 60 tons a day.

  • State-of-the-art Machinery
  • Equipped with state-of-the-art machinery, REITER for back
    process and TOYODA for ring frame.

  • Product Flexibility
  • Yarn counts range from 6/1 to 24/1 and able to process wide range of fibers including Polyester, Modal, Tencel, Viscose, ProModal, Thermolite and Cool Max etc.

CLOSINGTHE
LOOP

  • Recycling Plant
  • A recycling plant is being established that is GRS v 3.0 by Control Union for fabrics, garments and yarns with a capacity to recycle 2.5 tons of material per day. we are collaborating with I:COLLECT to process Post-Consumer Waste as well. The plant has the capability to process different kind of material like

  • SPINNING WASTE
    • Card Fly Waste
    • Yarn Cutting Waste
  • DENIM WASTE
    • Grey Waste
    • Knotting Waste
  • GARMENT WASTE
    • Consumer Waste
    • Table Cutting Waste
    • Leftover Pieces

  • OPEN END SPINNING

    State of the art open end machinery from Germany and Switzerland will be in operation for producing authentic denim yarns and fast production. Production capacity would be 9 tons a day. 25% of its raw material will be used from our recycling plant.

DenimAT A
GLANCE

Established in 2007 and now has a total capacity of 5.5 million meters of fabric a month.

  • State-of-the-art Machinery
  • Use sophisticated and modern machinery from the USA
    and Europe

  • Cost Effectiveness
  • Capable of producing wider width fabrics that contributes
    to being cost effective and lead-time for producing fabric is
    30-35 days.

  • Wide Range of Colors
  • Wide range of colors starting from very light to deep
    shades, toppings, bottoming’s, bromos, and special colors.

SUSTAINABLE
PROCESSING

  • ECO-FINISHING

As part of our philosophy of continuous improvement, Soorty re-imagined the use of Monfort’s Eco-applicator by engineering
it to integrate in the fabric finishing process. The result of this innovation is below:

GarmentsAT
A GLANCE

Established in 1983 and has a capacity to produce 2.5 million denim pieces per month.

    • Short Lead Time

Lead time of 6-8 week for producing garment orders

    • Large Sampling Infrastructure

Production of 12000 samples a month.

    • Centralized Industrial Engineering

This department derives process innovation and is also
responsible for group level capacity and costing
management.

PROCESS
AUTOMATION

    Soorty prides itself in its ability to continuously innovate, using in-house resources and home-grown talent.We reward and recognize our employees involved in the innovations.

laundryAT
A GLANCE

Established in 1983 and capacity to produce 100,000 pieces per day.

    • State-of-the-art Machinery

We have complete Tonello setup for laundry machines.

    • Renowned Reproducibility

Our sample and bulk production matches very closely.

    • High Fashion Washes

70% of our production includes high fashion washes.

    • Industrial Engineering in Laundry

Minute based laundry planning and control. Only company
in Pakistan to use IE in dry and wet processing allowing
better capacity management and maximum efficiency.

SUSTAINABLE PROCESSING

SUSTAINABILITY IN LAUNDRY

Complete sustainable production with the help of following infrastructure.

  • Jeanologia Lasers machines
  • Ozone machines
  • E-Flow Machine
  • Environmental Impact Measuring Software
  • Green Screen Chemicals

HIGG INDEX

Soorty satarted using SAC’S sustainability metrics tool, the Higg Index, to derive enviormental responsibility across its supply chain.